Select a gear metering pump for standard operating conditions; choose a magnetic drive gear pump when the medium is corrosive or zero leakage is required to prevent shaft seal leakage.
First confirm the fluid viscosity and desired flow rate per revolution, then choose a model with a displacement closest to the 0.05–200 cc/r range, and finally match the motor speed and reduction ratio.
±0.5% refers to repeatability. For two-component mixing ratios, it is recommended to allow 1.5 times the margin and require a factory calibration report.
The pump body and gears can be selected from 440C, high-speed steel, or Stellite; use a canned motor seal or magnetic drive seal, capable of withstanding 350℃ high-temperature colloids.
Select wetted parts made of PTFE or Hastelloy, equipped with a magnetic drive seal structure to prevent direct contact between the medium and metal or sealing components.
Two-component dispensing requires two metering pumps with interlocked control, which can be set according to the A/B ratio and started/stopped in sync.
Under normal operating conditions, pressure loss is approximately 0.02–0.05 MPa; sizing calculations consider flow rate and viscosity, and a plate-type configuration can be provided separately for high-pressure applications.
Yes, there are orientation requirements. The inlet and outlet of both the pump and flow meter must be installed according to the marked direction; reversing the flow will reduce metering accuracy and affect seal life.
Yes, it is supported. The standard control cabinet includes a touchscreen, inverter, and mixing program, and can interface with on-site PLCs and host computers.
For standard models, 7–15 business days; for custom materials or complete systems, approximately 20–30 business days.
Yes. We can provide non-standard designs for flow paths, inlet/outlet orientations, and mounting hole patterns, provided you supply the fluid medium and operating condition parameters.
We can provide material certificates and factory calibration records; CE, explosion-proof, and metrology calibration certificates are available on a per-project basis.
The standard quotation includes installation guidance and initial commissioning; travel and lifting costs are billed separately based on actual expenses and can be itemized in the quote.
We keep common consumables such as gears, shafts, and seals in stock, with shipment within 3–5 business days after order placement; long-term customers may maintain safety stock levels.